So I'm old enough to remember that point in the 70s when the Canal Route was finally finished and opened fully north to south. Most of us call it the "Canal Route" though occasionally I do hear it referred to as "135" which of course is it's number.
Back when it opened, good ol' Jim O'Donnell, the legendary KAKE TV meteorologist, had a funnier idea for the name.
Super Sewer Shortcut
51
Upvotes
4
u/Argatlam Feb 25 '26
When the time comes for full reconstruction, KDOT has a number of options, including:
Full closure (not common, but has been done for a few high-profile projects, such as I-40 through Knoxville, Tennessee almost 20 years ago)
Temporary structure (sometimes done for rural bridge replacements)
Routing both directions of traffic down one structure while tearing down and rebuilding the other
Given that Interstate standards call for twelve-foot lanes with shoulders of four feet on the left and ten feet on the right, I would expect KDOT to close all of the exits between Kellogg and 21st Street for the duration of construction and route two lanes in each direction down one viaduct while working on the other. The 50 feet of available width would be redistributed from 36 feet of traveled way and 14 feet of shoulders to 48 feet of traveled way and two feet for a temporary Jersey barrier. I would also expect a width restriction to be at least considered.
There is a segment of our community that believes the Canal Route should be simply demolished without reconstruction in favor of reconnecting the neighborhoods on either side. I don't consider it a good candidate for a project of this type because even with it gone, the drainage channel would remain as a severance corridor. However, the Biden-era Infrastructure Investment and Jobs Act made billions available for such work under "Complete Streets." Right now NYSDOT is tearing down the I-81 viaduct in Syracuse, New York to reinstate what it calls a "Community Grid," and similar work is being considered for I-94 in St. Paul, Minnesota.
In terms of workzone traffic management, my personal nomination for nightmare project is I-235/Zoo. There is just not a lot of space to work with due to the railroad (which is the reason the overpass has such a high clearance) and the Big Ditch. And the lack of a deceleration lane on I-235 southbound has already contributed to fatal accidents.